STAND: 17.06.2019
9910_Operation-Manual_STANDMOVE_M1-0_Rev1v0_EN
Seite 14 von 23
8 Commissioning
Note:
Before commissioning, the controller and the handswitch must be electrically
deenergised.
Commissioning the controller, general
STAND.MOVE M1.0 is employed as an operating element for the STAND.CONTROL C1 or C2 control-
ler. Please follow the operating manual of the corresponding STAND.CONTROL for the commissioning.
Commissioning the STAND.MOVE M1.0
If you are using a STAND.CONTROL C1, connect the hand switch to one of the RJ45 sockets (D1 or
D2) on the controller.
When using the STAND.CONTROL C2, connect the hand switch with the corresponding RJ-45 socket
of the table controller (HS).
Ensure that when it is inserted, the RJ45 plugs snap into place audibly. Check the firmness of the hold
if required by pulling lightly on the cable.
Further details of the connections and expansion options
Caution:
After commissioning, accessory components may not be separated from the
controller during the movement. This can result in unpredictable behaviour of the table
and is a danger to the user.
Note:
It is recommended that the table controller be isolated from the mains supply
before every enhancement or replacement of accessories.