2-1
Section
Operating Procedures Flowchart
16
2-1
Operating Procedures Flowchart
This section shows a flowchart of the basic operating procedures up to using the
PT connected to the DeviceNet Interface Unit.
2-1-1 PT Settings Procedure
Turn ON the PT’s power supply.
Setting the PT Memory’s Input
and Output Areas
Download the system program.
Turn OFF the PT’s power supply.
Mount the DeviceNet Interface Unit.
Turn ON the PT’s power supply.
Settings in the PT’s system menu
(DeviceNet Software Switch settings)
•
Output area’s starting PT memory word
Example: PM0100
•
Size of output area
Example: 32 words
•
Input area’s starting PT memory word
Example: PM0200
•
Size of input area
Example: 32 words
•
Communications speed
•
Local node number
•
Strobe ON time setting
Transfer screen data.
Turn OFF the PT’s power supply.
Setup the DeviceNet network.
Turn ON the PT’s power supply.
PC vendor: Memory Link
Setting the PT Configuration with
the NT-series Support Tool
PT status control area
Example: PM0100 to PM0104
PT status notify area
Example: PM0200 to PM0202
Specify PC addresses for parts:
LED: PM010515
Touch switch input notification:
PM020300
Numeral memory table #0:
PM0106 and PM0107