
3.8 Wiring the Power Supply/Regenerative Unit Connector (CNA)
31
5. Connect the connector to the SERVOPACK.
After wiring the connector, reconnect the connector to the SERVOPACK.
Note: 1. Pull lightly on the wires to confirm that they are securely connected.
2. Be sure that none of the insulating sheaths of the wires are caught in the springs.
Connector for Power Supply/Regenerative Unit (CNA)
Pin No.
Symbol
Signal Name
1
L1
Power supply input terminals
2
L2
3
+
Regenerative unit connection ter-
minals
4
−
Power
s
upply/Regenerative Unit connector
JZ
S
P-CH
G
9-1
(Thi
s
connector i
s
s
upplied with the
s
ervopac
Power
s
upply
S
ingle-pha
s
e, 200 VAC
Molded-ca
s
e circuit brea
k
er
Noi
s
e filter
Magnetic contactor
AC reactor
Regenerative Unit
CNA connector
Fu
s
e
Fu
s
e
+(Y3)
—
Y4
Y5
C1
C2
1
2
3
4
L2
L1
TOEP_C710806_01A_0_0.book Seite 31 Montag, 2. Juli 2007 4:24 16