171
Procedures
Section 6-1
(2) When a new project has been created, ST programs can be set as the
PLC’s initial program type. Select
Tools - Options
and click the
PLCs
Tab to set this option.
6-1-3
Allocating the ST Program to a Task
The ST program that was inserted in the project must be allocated to a task as
an execution unit. If a program has not been allocated to a task, there will be a
check mark over that program’s icon in the project workspace.
Note
The following procedure, which allocates a program to a task, can be per-
formed after the program has been created, but always allocate the programs
before transferring the user program to the PLC.
Use the following procedure to allocate a program to a task.
1,2,3...
1.
Right-click the inserted ST program item in the project workspace, and se-
lect
Properties
from the pop-up menu.
Select the
ST
Option.
Summary of Contents for CX-PROGRAMMER V8.1
Page 3: ...iv...
Page 5: ...vi...
Page 7: ......
Page 15: ...xvi...
Page 19: ...xx...
Page 25: ...xxvi Application Precautions 4...
Page 26: ...Part 1 Function Blocks...
Page 27: ......
Page 153: ...128 Procedures Section 3 2...
Page 154: ...Part 2 Structured Text ST...
Page 155: ......
Page 159: ...134 CX Programmer Specifications Section 4 2...
Page 205: ...180 Procedures Section 6 1...
Page 207: ...182 System defined external variables supported in function blocks Appendix A...
Page 229: ...204 Revision History...
Page 230: ......