7. Connection Procedure
7.3.3. Transferring Project Data
Transfer the project data from the Sysmac Studio to the Controller.
1
Select
Online
from the
Controller Menu.
2
When an online connection is
established, a yellow bar is
displayed on the top of the Edit
Pane.
3
Select
Synchronization
from
the Controller Menu.
4
The Synchronization Dialog Box
is displayed.
Check that the data to transfer
(NJ501 in the right figure) is
selected. Then, click the
Transfer to Controller
Button.
22
Summary of Contents for 3G3MX2 Series
Page 34: ...2013 0911 P521 E1 01...