7.2 Commissioning
A minimum available voltage of 220Vdc and a DC power of >30Wdc is required before
the inverter starts feeding power to the grid.
AC side:
Turn on the AC circuit break and the display module will works.
DC side:
Turn on the DC switch.
When the inverter is started for the first time, a menu is displayed to choose language
and the country where the inverter installed, English, Dutch and Deutsch are available
for display.
7.3 Operation
7.3.1
System operation interface Switch system interface by clicking
“ENTER”.
System operation interface 1:
In this interface, the displayed
“
Waiting 0
” part will switch along with the system operation
status.
The system will have the following status:
NOTICE
You need to confirm that you choose the right country safety
to ensure that compliance with local standards.
NOTICE
The power supply of display module is AC grid, so the screen will
not be available until AC is connected.
Summary of Contents for Omniksol-10k-TL3
Page 2: ......
Page 10: ...8 3 Product Information 3 1 Overview Industrial Layout Excellent Heat Elimination...
Page 48: ...46 Fig Fill in the power station information...
Page 54: ...52 Fig Alert Interface Fig System Setting Interface...
Page 60: ...58 Click Start to continue Click Refresh to search available wireless networks...
Page 64: ...62...