
Powering Up
When the Omnia-6EX is first turned on, there is a few seconds of delay as the system starts up. You should notice
revolving
Omnia
logos on the screens, and then the main screens should appear.
After approximately ten seconds, audio will be present from the analog, composite and headphone outputs. The
AES/EBU outputs also become usable at this time. However, full initialization of the ports is not complete for
several more seconds and there could be a brief, sub-second interruption while the AES/EBU IC’s configurations are
being verified by the operating system. After 25 to 30 seconds, the Meter and Main Menu displays will appear on
the left and right LCD screens respectively. At this point, the Omnia-6 is fully operational.
Omnia-6ex Use and Operation Manual – V: 1.10
22