background image

08

®

Verify that the location the probe is to be mounted
is clear from the stream of product (Fig. 1).

When installing more than one probe in your
process, verify that they are separated by a
minimum distance of 500mm (Fig. 1).

Material falling onto the probe can cause damage
or switching errors. If this is unavoidable, it is
recommended that a protective shield be installed
above the probe to protect it. The shield is also
recommended when the probe is use for a low
level switch or in the outflow of the product (Fig. 2).

The tip of the probe should slightly point
downward ( when possible) so that if there are any
excess of product it will easily slide from the probe
(Fig. 2).

When installing from the top of the tank confirm
that the tip of the probe has cleared the side of the
vessel at least 500mm (Fig. 3).

When installing the sensor directly to the tank
make sure that the rod extends beyond the inner
wall of the tank, by as much as possible, so that
internal build up or other debris does not interfere
with the sensor's performance (Fig. 2 correct Fig.
4 incorrect).

Installation

Installation

500mm

500mm

500mm

Fig. 1

Fig. 3

Fig. 4

Shield

Fig. 2

Summary of Contents for LVCN6000 series

Page 1: ...LVCN6000 7000 Series Capacitive Point Level Detection...

Page 2: ......

Page 3: ...ail info omega com Introduction 4 Models Dimensions 5 Wiring Diagram 6 Installation 8 Relay Status Guide 7 Calibration 10 Handling 11 Technical Specifications 12 Trouble Shooting 14 Warranty Disclaime...

Page 4: ...the probe comes in contact with the medium the frequency of the oscillation reaches a preset point and the detection circuit signals the switch to change state Technology Both models can be made with...

Page 5: ...FE or PVC Standard 3 4 or 1 NPT 20mm 1 2 2 3 Tri Clamp Connection 80mm Models and Dimensions 20mm 1 NPT Extended Length TC Connection Rubber Seal Process Connection L 50mm 20mm 1 2 Flange Connections...

Page 6: ...2 9 3 4 5 6 7 5 0 1 2 3 4 6 7 8 9 10 Sensitivity 10 1 20 sec LVCN6000 NO 24Vdc NC Delay Time Delay Adjustment Sensitivity Adjustment LVCN6000 Aluminum Housing LVCN7000 Nylon Housing Power Supply L1 L2...

Page 7: ...robe uncovered Maximum fail safe Minimum fail safe Probe uncovered Level NO NC Red LED Yellow LED Green LED H L ON ON ON ON ON OFF OFF OFF OFF ON ON ON 6 6 6 6 7 7 7 7 4 4 4 4 5 5 5 5 Probe covered Pr...

Page 8: ...l switch or in the outflow of the product Fig 2 The tip of the probe should slightly point downward when possible so that if there are any excess of product it will easily slide from the probe Fig 2 W...

Page 9: ...tering the housing Fig 7 Verify that the probe has been wired as per the instructions on page 7 The probe must be installed utilizing the type of connection provided The Capacitance Probes Series will...

Page 10: ...ectronics sticker using a pen or pencil If the LED does not turn Off leave the potentiometer completely turned counter clockwise Fig 3 6 Now that you have marked minimum and maximum settings for your...

Page 11: ...mum performance The probe should not be dropped or suffer any impact or fall that could damage the electronics or the plastic tip of the probe Fig 4 and 5 Seal the thread with Teflon tape before insta...

Page 12: ...to 20 seconds Led status on off 3 4 to 1 1 2 BSP or NPT flange or sanitary connections Glass filled nylon 145 PSI 10 Bar 14 to 176 F 10 to 80 C IP 65 Current Consumption Frequency oscilation Enclosur...

Page 13: ...s Led status on off 3 4 to 1 1 2 BSP or NPT flange or sanitary connections Glass filled nylon Aluminium 145 PSI 10 Bar 14 to 176 F 10 to 80 C IP 65 Current Consumption Frequency oscilation Enclosure M...

Page 14: ...ing Doesn t Power Up Doesn t Detect Medium Low sensibility Adjust sensibility trimpot Always On Build up on the sensor Clean sensor then adjust sensibility Green LED Off No power Verify current supply...

Page 15: ......

Page 16: ......

Reviews: