10
7.
Maintenance
The automatic operation of the product requires maintenance to ensure that it continuous
to operate perfectly.
Before maintenance depressurize the product and keep
to the safety rules when working with pressure
equipment.
Weekly:
Rotate the "Test" button and manually drain the accumulated condensate until air begins
to blow from the drain. If a significant amount of water (more than 0.5 litres) exits the
valve then the drain must be thoroughly cleaned.
Monthly:
Visually check seals on the body and the pipe connection, make sure there is no leakage.
If strainer is installed prior the drain, check and clean it.
Yearly:
Clean interior of the reservoir regularly. Intervals of cleaning depend on contamination
of condensate.
Replace the sealings if necessary.
Make a visual check of the drain and make sure there is no visual damage or leakage.
7.1.
Service
It is recommended to clean the reservoir at least once a year. Sealing elements are subject
to wear, which depends on various operating parameters such as pressure, temperature,
dirt content, etc. It is also recommended to change seals.
7.2.
Spare parts
Replacement seals are available on demand. Please contact your distributor or
manufacturer.
8.
Transport and storage
A product must be handled, transported and stored with care:
The product must be transported and stored in its protective packaging until it is
installed.
When the product is stored prior to installation, it should be kept in closed rooms
and protected against harmful influences such as dirt, moist and frost.