17
Maintenance
ALUMINUM/STAINLESS STEEL SEAL BEAM
REMOVE THE SEALING AND CUTTING WIRES AS FOLLOWS:
1. Remove the old wires by pulling them loose from the seal beam contacts.
2. Loosen the clamp screws and remove the seal beam from the U-profile.
3. Remove the Teflon tape from the seal beam.
4. Remove the mounting plates on both ends of the seal beam by loosening the screws; this releases the
sealing wires and/or sealing and cutting wires.
5. Clean the seal beam thoroughly.
NOTES
• After removal of the wires, check the strips of fiber glass for damage; replace if necessary.
• Check the condition of the tensioning springs at both ends of the seal beam; replace if necessary.
• Using the seal beam without the springs may cause the sealing wires to break.
• Check contact plate for damage; replace if necessary.
INSTALL THE SEALING AND CUTTING WIRES AS FOLLOWS:
1. If necessary, install new strips of fiber glass on the seal beam.
2. Insert the new wires behind one of the mounting plates and tighten the screws; make sure that the end of
the wires line up with the bottom edge of the mounting plate.
3. Position the wires across the seal beam and loosely install the second mounting plate.
4. Carefully clamp the seal beam upside down in a bench vice.
5. Pull the wires as tightly as possible with a pair of pliers and secure the second mounting plate by tightening
the screws.
NOTE
1. The wires can be further tightened by slightly loosening the screws of one of the mounting plates.
2. Pull the wires one-by-one tighter with a pair of pliers.
3. Re-tighten the screws after the correct tension has been achieved.
4. Cut the end of the wires flush with the bottom edge of the mounting plate.
5. Apply the Teflon tape smooth and tight over the seal beam without creases. Make sure that the beam is
clean and free of grease.
6. Re-install the seal beam in the vacuum chamber and re-connect the wires.
ALUMINUM T-SHAPED SEAL BEAM
REMOVE THE SEALING WIRES AS FOLLOWS:
1. Remove the seal beam from the machine.
2. Remove the Teflon tape.
3. Loosen the screws on both sides of the beam; this will release the sealing wires.
4. Clean the seal beam thoroughly.
INSTALL THE SEALING WIRES AS FOLLOWS:
1. Apply new fiber glass to the beam if necessary.
2. Place new wires on the beam and fasten them on one side with mounting plates; tighten the screws.
Summary of Contents for VP-NL-0004-SN
Page 21: ...21 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 Overall...
Page 22: ...22 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 Vacuum Chamber...
Page 23: ...23 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 Lid...
Page 24: ...24 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 Hinge...
Page 25: ...25 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 Air Valve...
Page 26: ...26 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 Sealbeam...
Page 27: ...27 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 4m3 Transformer...
Page 28: ...28 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 8m3 Transformer...
Page 29: ...29 Parts Breakdown Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007 Control Panel...
Page 43: ...43 Electrical Schematics Model VP NL 0004 SN 59006 Model VP NL 0008 SN 59007...