6
Installation
Operation
ASSEMBLING THE PUMP
1. Insert the pump inside the plastic pipe, then tighten it with
the screw.
2. Put the lid with pump asembly inside the warmer, assembly
is complete.
The warmer is intended to be used with its 3.5 QT stainless steel insert.
1.
Fill bowl with 1 and 1/3 quarts of hot water.
2. Turn on the warmer.
3. Insert product in the included 3.5 QT stainless steel insert.
4. Cover the unit with its dispenser.
5. Allow the contents to pre-heat to the desired temperature, set the thermostat to the desired holding
temperature.
NOTE
Pump insert will not function properly until contents are properly pre-heated.
DO NOT OPERATE ON HIGH HEAT FOR MORE THAN 45 MINUTES – CONTENTS MAY OVERHEAT.
PRIMING PUMP
Pump may take up to three depressions of the plunger to fully prime and vend thick products. If the pump does
not dispense properly, remove and make sure the O-ring is in the correct place. If it is missing, make sure the
O-ring did not get pulled into pump plunger tube. Failure to do this can result in a broken O-ring being pumped
out when the food is dispensed.
Summary of Contents for FW-CN-0004
Page 8: ...8 Parts Breakdown Model FW CN 0004 44310 Model FW CN 0004 S 44311...
Page 10: ...10 Parts Breakdown Model FW CN 0004 P 44312...
Page 12: ...12 Electrical Schematics Model FW CN 0004 44310...
Page 13: ...13 Electrical Schematics Model FW CN 0004 S 44311...
Page 14: ...14 Electrical Schematics Model FW CN 0004 P 44312...