
UES-40
Disassembly and Reassembly Procedure
3-12
ISSUE4
(6) Remove the attached NUT and 2 WASHERS
holding the VOLUME HARNESS, and
remove the VOLUME HARNESS.
Box screwdriver (8 mm between opposite sides)
Neji-lock (during reassembly)
Note: During reassembly, apply Neji-lock to
the HARNESS threads. When viewed
from the position shown below, affix it
so that the three harnesses attached
to the VOLUME HARNESS faces up
from the center position.
(7) Remove the 4 SCREWS (CUTB3x8SZ) hold-
ing the SPEAKER HARNESS.
Phillips screwdriver (No. 2)
Note: During reassembly, attach the har-
nesses attached to the SPEAKER
HARNESS in the orientation shown in
the figure to the left.
(8) Remove the 2 attached NUTS holding the
FSW MONO HARNESS, FSW BI HARNESS,
and EARTH PLATE, and remove the FSW
MONO HARNESS and FSW BI HARNESS.
Wrench (19 mm between opposite sides)
Note: During reassembly, pay attention to
the following items.
• Align the D cut of the foot-switch
connector with the D cut of the ISO-
LATION PLATE, and attach them.
• Attach the FSW MONO HARNESS
and FSW BI HARNESS in the proper
position.
FSW BI HARNESS: Pin 3 (top)
FSW MONO HARNESS: Pin 5 (bot-
tom)
Attached
WASHER
Attached
NUT
VOLUME
HARNESS
SPEAKER
HARNESS
CUTB3x8SZ
4 SCREWS
Center position
FSW BI HARNESS
FSW MONO HARNESS
EARTH PLATE
ISOLATION
PLATE
Attached
2 NUTS