Battery replacement process
1
2
922504450_09_018
Page 4 from
4
3
4
(*)
Maintained operation: The luminaire lights its illumination source, when it is powered by the
mains power supply or not
.
Non-Maintained operation: The luminaire lights its illumination source,
only in power supply’s
failure.
In case that the led strip must be replaced to ensure lumen output LED module can be replaced
only by a competent personnel.
NOTE:
LED= Light Emitting Diode
LABELING EXPLANATION:
X: Self contained
1: Maintained (*)
A: Including test device
180: 3 hour duration
1 Unfasten the 4 screws without moving the marking panel
.
2
Unfasten the 4
screws and remove the marking panel.
3
Slide out carefully the electronic parts and the battery.
4 Install the battery’s connector to the appropriate P.C.B connector.
5 Slide in carefully the electronic parts and the battery.
6
Refit the marking panel and fasten the removed screws in steps 1 and 2
.
WARNING
!!
Use a maximum torque of
0,25Ν
m
to tighten the screws
.
ΝΟΤΕ!!
In case of battery replacement the used battery must be replaced with a new one of
the same type, by the manufacturer or by a competent person.
NOTE!!
After finishing the installation you must power the luminaire at least for 24 hours for battery
charging to perform the named autonomy.
General
:
1. Operations for installation, maintainance or testing must be done by authorized personel only
.
2.
The device must be connected to the mains power supply thru a fuse dependent by the total
amount of the line’s power load
.
t i
in battery recycling points. Do not incinerate.
3.
In case of inactive use for a period greater than 2 months, disconnect the battery by pulling out
the battery’s connector.
4.
I s not allowed to discard batteries in to common trash bins, they must be discarded
only