energy

During this mode the device enters in idle 

state

 

and  battery  consumption  is  negligible,  in 

order to be protected from deep discharge.

This test can be done by pushing the test button. 
The light source and the emergency circuit of the 
device  are  monitored.  The  manual  test  can  be 
conducted only if the main power supply and the 
battery  are  connected.  During  this  test  period  all 
indication LEDs are OFF.

This test monitors the device’s back up operation 
and  emergency  duration.  The  BATTERY  FAULT 
LED  blinks  during    the  test,  indicating  this 
process  to  the  user.  This  test  is  conducted 
automatically  every  six  months

In  order  to  be 

performed,  the  mains  power  supply  should  be 
connected and the battery  must be fully charged

If  the  battery  is  not  fully  charged

the  test  is 

postponed

 

until  the  battery  is    completely 

charged.  If  during  this  test,  the  autonomy  is  less 
than  the  nominal  then  the  battery  fault  led  turns 
on  continuously  indicating  that  the  battery  must 
be replaced.

Manual

 Test

Automatic Operational Test

This  test  includes  all  the  operations  that  provide 
the  manual  test  and  is  conducted  automatically 
every  15  days.  In  order  to  be  performed,  the 
mains  power  supply  and  the  battery  should  be 
connected.  

Automatic Autonomous Test

The luminaire has the ability to be connected to 
GR-6500  panel.  In  order  to  do  so,  the 
luminaire’s  address  has  to  be  unique  in  the 
same  bus.  For  more  details  see  page  3 
(installation instruction).

The  autonomous  duration  of  battery  during 
emergency mode is at least the one that is stated 
in  the  list  of  the  technical  characteristics.  During 
emergency  mode,  a  light  source  test  is  also 
performed.

Resetting Errors

Test Switch

Push  the  Test  button  for  >10  seconds,  to  delete 
all  the  indicated  LED  errors.  Then    the  device 
enters regular

 

operation mode.

Pressing the test switch less than 5 seconds will 
initiate a light source test (last for 3 secs).

Back Up Operation

If  the  test  switch  is  pressed  for  more  than  10 
seconds,  the  device  will  be  reset  (delete  all 

Addressable communication

ΑΤΤΕΝΤΙΟΝ

!!!

1.  Operations  for  installation  or  maintainance 
must be done by authorized personnel only

.

2. 

The  device  must  be  connected  to  the  mains 

power  supply  through  a  fuse  dependent  by  the 
total amount of the line’s  power load

.

errors).

3.  The  replacement  of  the  battery  and  the  light 
source  must  be  done  using  parts  of  the  same 
type,  by  the  manufacturer  or  by  a  competent 
person.

4

In  case  of  inactive  use  for  a  period  greater 

than  2  months,  disconnect  the  battery  by  pulling 
out the battery’s connector.

 

5

I

s  not  allowed  to  discard  batteries  into 

t  i

common  trash  bins,  they  must  be 
discarded  only 

in  battery  recycling 

points. Do not incinerate.

LABELING EXPLANATION:

A:

 Including test device

Maintained  operation:  The  luminaire  lights  its 
illumination  source,  when  it  is  powered  by  the 
mains power supply or not

.

X:

 Self contained

CN1:

 Power supply & communication signals

(*) 

Non Maintained operation: The luminaire turns 

on illumination source,

 

only in case of power 

supply failure.

CN2:

 Non user connector

F:

 Automatic test gear complying with IEC 61347-

2-7 denoted EL-T

CN5:

 Battery connector

NOTE:

 LED= Light Emitting Diode

18

0:

 

3

 hour duration

0:

 Non maintained (*) 

Connectors:

B:

 Including remote test mode

C:

 Including inhibiting mode 

CN3:

 Non user connector

Page

 

2 from

 

8

Status of LEDs

LEDs

Description of indication

CHARGE              : Battery charging,    : battery charged,    : disconnected  battery   

LAMP FAULT        : Operation check,    : lamp fault,    : normal operation

BATT. FAULT        : Autonomy test,    : autonomy fault,    : normal operation

                            Note          : Blinking,    : constantly on,    : off

X

0

A

B

F

C

8 0

1

92329300

8

_09_00

2

Summary of Contents for GR-292/M/HL/ADR

Page 1: ...ICS for LED MODULE specifications see page 8 GR 292 M HL ADR GR 293 M HL ADR MAXIMUM POWER CONSUMPTION 4 9W 5 2 VA BATTERY 4 8V 4Ah NiMH 4KRMT 23 62 U OUT 6V prolonged staring into the luminaire at a...

Page 2: ...st button for 10 seconds to delete all the indicated LED errors Then the device enters regular operation mode Pressing the test switch less than 5 seconds will initiate a light source test last for 3...

Page 3: ...tion can be achieved after that time 1 Untighten the screw and pull up the reflector 7 Mount the luminaire on the ceiling BEWARE of electric shock after reflector removal Plastic base could contain li...

Page 4: ...suspended ceiling as it is shown bellow Required opening 110mm Step 2 Push up the luminaire as shown in figure 2 Step 3 Continue to push upwards until the lamp locks If you want to pull off the device...

Page 5: ...2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3...

Page 6: ...2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3...

Page 7: ...ry charge indication LED Figure 4 FAULT LAMP CHARGE BATT GR 292 M HL ADR Escape Route Anti Panic Area GR 293 M HL ADR A 290 BAT 286 mm 31 mm 33 mm TEST Test button TEST TEST TEST 50 mm Address Dipswit...

Page 8: ...ocuments given by Olympia Electronics or if the buyer modifies the goods provided or has any repairs or re setting done by a third party unless Olympia Electronics has fully agreed to them in writing...

Reviews: