56.
Locate all
Metal Roof Panels
and
Metal Roof Hangers
. To
temporarily help hold the
Metal Roof Panel Long
in place, hook a
Metal Roof Hanger
onto the lower
Batten
approximately where the
center of the first panel will be. Place the first
Metal Roof Panel Long
on
Battens
. Do not fasten Panels down until
Step 62
. place remaining
Metal Roof Panels
on Hangers the same way.
Parts (Steps 56 - 66)
Metal Roof Panels Long
(86” long)
x 6
Metal Roof Panels Short
(41” long)
x 6
Hardware (Steps 56-66)
2” - Metal Roof Screws
x 54 total
Hardware (Steps 56-66)
Metal Roof Hangers
x 6
total
Metal Roof Panels overlap eachother
57.
Metal Roof Panels
overhang on the side of shed should be approximately 4” and is set by
Metal Roof Hangars
. Overall width past the end of
Battens
on front and rear can vary from 1” -
3” depending on your personal preferences The
Metal Roof Panels
have room to space out to
achieve desired overhang.
1” - 3” of overhang past
the battens.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 32
4”