34.
Lay out
12 Rafters
,
2 Soffits
and the
completed
Ridge Board
from
Step 33
on level
ground as shown. Double up
Rafters
as illus-
trated. Screw doubled up
Rafters
together with
3 - 2 1/2” screws
.
Note:
completed rafter sec-
tion will be flipped over in
Step 38
.
Parts (Steps 34 - 37)
Ridge Boards
(3/4” x 9 1/4” x 45 1/2”)
x 2
(3/4” x 9 1/4” x 91”)
x 3
Rafters
(1 1/2” x 3 1/2” x 80 7/8”)
x 24
Soffits
(1/2” x 4 1/2” x 91”)
x 4
Hardware (Steps 34 - 37)
S1
- 2 1/2” Screws
x 18
total
S3
- 2” Screws
x 48
total
S2
- 1 1/4” Screws
x 48
total
35.
Attach completed
Ridge Board
to ends of both outside
Rafters
with
2 - 2” screws
per end.
Measure and position interior
Rafters
as illustrated above. When positioned correctly, attach
Ridge
Board
to remaining
Rafters
with
2 - 2” screws
per rafter end.
Important:
Pilot Hole
Ridge Board
to
prevent splitting.
Completed Ridge Board
Important:
Pilot
hole Ridge Board
to prevent splitting
2 1/2” Screws into Doubled up Rafters
Soffits
Important:
Measure 20 1/2”
spacing accurate-
ly to accomodate
Polygal Panels.
See Step 66.
Expert Advice:
Use Polygal Panel
to confirm correct
width
20.5”
20.5”
20.5”
20.5”
20.5”
20.5”
20.5”
20.5”
182”
45.5”
45.5”
45.5”
45.5”
Completed Ridge Board
Rafter
2 - 2” Screws / Rafter
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 23