52.
Locate
3H - Roof Batten Short.
Place Batten on Rafters 13” up from first Batten. Pre-drill pilot
holes with 1/8” bit. Secure with
3- 1 1/4” screws
.
Top-Down View
13”
53.
Locate two more
3H - Roof Batten Short
and line up as shown above
.
Maintain 13” between
long and short Battens all the way across. Pre-drill pilot holes with 1/8” bit and secure each Short
Batten to Rafters with
3 - 1 1/4” screws
each.
13”
54.
Third row of Battens will use
3G - Long Roof Battens.
Place Battens 13” up from second row
of Battens.Follow attachment as per
Steps 50-51
.
13”
13”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 28