Side Facia
(11° cut ends).
Front Facia.
Nailing Strip.
Side Facia.
Front Facia
2 Nails per
rafter end
78.
Locate
4L - Front/Rear Facia
&
4M - Side Facia
.
Start
by positioning one front facia up against front end of rafters.
Parts (Steps 78 - 82)
4L - Front/Rear Facia
(3/4” x 5 1/2” x 72 3/4”)
x 4
4M - Side Facia
- 11° cut ends (mirrored)
(3/4” x 5 1/2” x 60”)
x 4
79.
Next, have your helper place an angle cut Side Facia Board up tight
under metal roof and flush against nailing strip. Line front facia up so it
caps the side facia. With front facia correctly aligned, attach front facia to
rafter ends with
8 - 1 1/2” Finishing Nails
. Attach side facia to edge of
nailing strip and batten ends with
5 - 1 1/2” Finishing Nails
.
Hardware (Steps 79 - 82)
N1 - 1 1/2” Finishing Nails
x 52 total
80.
Align and attach remaining front facia as per
Step 79
. Align next two side facias on opposite side as
first side facia. Once again, do a dry run before attaching. There will be a Facia Detail Plate attached in
Step 83
to hide any gaps where facia pieces meet in the middle.
Front
facia caps
side facia.
Note:
All Trim, Facia and Bottom Skirting pieces
will be positioned rough face out when installed.
Do a dry run using side
and front facia to help
you correctly position
before attaching.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 39