1. Floor Section
Flush
with
framing
Plywood Floor
Large - 3pcs. (Part 1D)
Floor Joist
Frames Large -
3pcs. (Part 1A)
Floor Runners -
10pcs. (Part 1F)
Plywood Floor
Small - 3pcs.
(Part 1E)
Concrete Pad
(optional foundation method)
Floor Joist
FramesSmall -
3pcs. (Part 1C)
Exploded view of all parts necessary to complete
Floor Section. Identify all parts prior to starting.
Note: Floor Footprint is 136 1/2” wide x 96” deep.
2.
When correctly positioned, attach each Joist with
4 - 2 1/2” screws
(2 per end).
You can find the Square Drive Screw Bit in the Hardware
Kit Bag.
Complete 2 remaining Large Floor Joist Frames.
Hardware
S1
- 2 1/2” Screws
x 24 total
1.
Lay out
1A - Floor Joist Frames
and two of
1B - Floor Joists
as
illustrated above. Position Joists equally in Floor Joist Frame. Use
1C -
Small Floor Joist Frame
as a template to determine joist
position. Position Joist so flush with framing.
Parts (Steps 1 - 2)
1A - Large Floor Joist Frames
(45 1/2” x 75”)
x 3
1B - Floor Joists
(1 1/2” x 3 1/2” x 71 3/4”)
x 6
Center Floor
Joists - 6pcs.
(Part 1B)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]