98.
Place
Handrail Support Blocks
beneath Handrails, centered side-to-side and front-to-back.
Attach each block with
2 - 2 1/2” screws
through the Handrail bottom.
Parts (Steps 98)
Handrail Support Blocks
(1 1/2” x 3 1/2” x 3 1/2”)
x 3
Hardware (Steps 98)
S1
- 2 1/2” Screws
x 6 total
Parts (Step 99 )
Flower Box Kits
x 3
Hardware (Step 99)
S1 - 2 1/2” Screws
x 6 total
99.
Assemble
Flower Box Kits
with Assembly Instructions included
on Page 53. Position completed Flower Box below bottom of window
trim and secure with
2 - 2 1/2” screws
. Screw from inside of box into
the center wall stud.Attach second screw 2” underneath first screw and
once again into the wall stud. Install Flower Box Kits underneath each
window/double-window..
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 52