68.

  Attach 

Rear Filler Trims

 to rear walls, positioned flush with siding and bottom skirting. Attach 

with 

8 - 1 1/2” Finishing Nails

.

67. 

Trim out side walls by attaching 

Top Wall Trim

. Position with thick end of Bevel downwards at 

top of wall, tight against Soffits. Attach with 

4 - 1 1/2” Finishing Nails 

per piece. Complete both sides

Parts (Steps 67)

 

Top Wall Trim 

(1/2” x 1 1/2” x 45 1/4”)

 x 4

Hardware (Steps 67) 

N1

 

- 1 1/2” Finishing Nails

  

x 16 total

Parts (Steps 68)

 

Rear Filler Trims 

(3/4” x 2 1/2” x 75”)

 x 2

Hardware (Steps 68) 

N1

 

- 1 1/2” Finishing Nails

  

x 16 total

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 38

Summary of Contents for Santa Rosa SR812-FJ-Cedar

Page 1: ...d repair Version 2 2 January 24 2022 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 1 In the event of a missing or broken piece simply call the Outdoor Living To...

Page 2: ...on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manual I...

Page 3: ...of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 2 1 Cubic Yards of gravel require...

Page 4: ...s Long 2 3 4 x 2 1 2 x 19 Front Top Plates Short 1 1 x 1 x 32 Doorway Floor Transition Strip 2 Rear Gable Half Walls 2 16 long and 7 1 2 long Rear Gable Filler Shingles 2 Middle Gable Walls C Rafter a...

Page 5: ...Rear Facia 4 3 4 x 3 1 2 x 71 3 4 Side Facia 2 1 2 x 4 1 2 x 43 1 4 Horizontal Gable Trims Bevel 1 Large Facia Detail Plate 2 Pentagon Detail Plate Miscellaneous 4 3 1 2 x 3 1 2 x 42 Short Deck Post...

Page 6: ...Required Not Provided Ladder Screw Gun Drill Tape Measure Hammer Wood Clamp Level Pliers Tools Required Not Provided 1 8 Drill Bits 90 Metal Bracket x 8 Black Drop Latch Interior Barrel Bolt Finishin...

Page 7: ...s Brush off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour P...

Page 8: ...osition Joist so flush with framing 2 When correctly positioned attach each Joist with 4 2 1 2 screws 2 per end You can find the Square Drive Screw Bit in the Hardware Kit Bag A Floor Section You can...

Page 9: ...6 2 1 2 screws per section Hardware Step 4 S1 2 1 2 Screws x 18 total Hardware Step 5 S1 2 1 2 Screws x 16 total Material used for Floor Runners are not graded for appearance Some defect is allowed 7...

Page 10: ...r and floor runners will sit on your foundation It is important to note that having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete p...

Page 11: ...ine proper wall orienta tion B Wall Section Door Jamb 1 Bottom Wall Plates 4 Rear Gable Filler Shingles 2 Rear Gable Walls 2 Rear Top Plates 3 Side Top Plates 4 Angle cut on edge Middle Gable Walls 2...

Page 12: ...ith All Solid Wall Panels carefully lay panel face down Position and attach Bottom Wall Plates to bottom of wall studs of each wall panel with 3 2 1 2 screws Position so Wall Plates are flush with fra...

Page 13: ...ntinue to attach walls together as per Step 15 17 When attaching front corner wall panel make sure panel is nested inside the side panel Line up wall framing and secure at top middle and bottom of wal...

Page 14: ...2 screws Align Door Header on top of Narrow wall framing and on top of Door Jamb See picture below Secure with 4 2 1 2 screws 1 overhang Door Jamb Side Wall Door Header flush with inside framing 1 2 r...

Page 15: ...Front Wall Trim Supports 1 x 4 x 74 7 8 to Front Extension using 2 2 screws Make sure Front Extension is Flush to back and thick side of Wall Trim Supports and 1 2 pro truding on thin side of Wall Tr...

Page 16: ...Porch Post Deck Board 2 2 1 2 Screws 2 2 1 2 Screws Flush Flush Pre Drill Pre Drill Thick edge of Wall Trim Support D Attach a Hand Rail Section to the Long Porch Post Hand Rail should start 3 1 2 fr...

Page 17: ...the bottom of the Corner Bracket Drill Pilot holes before screwing to prevent splitting Corner Bracket centered on Long Porch Post 3 2 screws Pre Drill 3 2 screws Pre Drill Corner Bracket in line wit...

Page 18: ...oor Joists with 4 2 Screws Pre drill pilot holes before fastening screws Complete other side the same View from below Flush with Side Wall Framing Thin part of Wall Trim Support covers siding on Front...

Page 19: ...to install roof section 22 Attach remaining 15 Deck Boards using 4 2 Screws per piece Equally space all deck boards before attaching Ensure screws enter the floor joists beneath deck boards Pre drill...

Page 20: ...floor frame When positioned correctly fasten bottom wall plates to floor using 4 2 1 2 screws per wall panel Wall Plate 32 wide Confirm 32 Wide Door Opening at Top and Bottom Angle screws into perimet...

Page 21: ...osition top plate on wall plate so it is flush with inside of wall plate Side plate should also be flush with rear wall plate Secure with 4 2 screws per rear piece 1 2 screw 3 1 1 4 screws per front p...

Page 22: ...Finishing Nails 30 Locate both Rear Gable Wall pieces Rear Gables have shingles that overhang the top and bottom of the gable frame Screw together with 3 2 1 2 screws Hardware Steps 28 S1 2 1 2 Screws...

Page 23: ...Complete attachment in Step 50 with additional 8 2 screws Screw from the bottom of gable framing down into Top Plate and Wall 31 From the outside slide in a Rear Gable Wall Filler Shingle to cover gab...

Page 24: ...hen in correct position attach with 2 2 screws tem porarily as per Step 30 Later in Step 46 complete attachment with 8 more 2 Screws 33 Locate both Middle Gable Walls and attach together as per Step 3...

Page 25: ...nectors 2 Roof Gussets 2 Rafter Brackets 6 4 Single 2 Double Parts Step 35 Ridge Board Long 3 4 x 4 1 2 x 84 x 2 Ridge Board Short 3 4 x 4 1 2 x 52 1 2 x 2 Hardware Step 35 SS2 3 4 Screws x 16 total 3...

Page 26: ...r in Step 38 38 Attach end of a Soffit Board flush to ends of outside Rafters with 2 1 1 4 screws per rafter end Drill pilot hole in Soffit ends to prevent splitting Complete both outside Rafter Soffi...

Page 27: ...le framing until bottom of Ridge Board slips into gable notch Soffit will sit approximately 1 8 away from wall panel Soffit Gable Notch Ridge Board Rafter Rafter will slightly overhang siding of Middl...

Page 28: ...on as per Steps 39 42 44 When both Rafter Sections are correctly aligned Ridge Boards will sit in both the rear and middle gable notches Front Rafters will overhang Porch Posts Rear Gable Note Metal R...

Page 29: ...ush together and secure them with 12 1 1 4 screws To completley secure Ridge Boards place 4 1 1 4 screws into any of the remaining Metal Ridge Board Connector holes Complete both sides Important If th...

Page 30: ...4 screws and 2 2 screws per Single Bracket and 6 2 screws per Double Bracket 2 Screws 2 Screw 2 Screw 1 1 4 Screw 2 Screws 1 1 4 Screw Hardware Step 49 S2 1 1 4 Screws x 8 total S3 2 Screws x 20 tota...

Page 31: ...ywood on roof should be inset 1 8 from end of rafter at bottom 3rd Rafter from the outside Screw bottom row of shingles down to rafter with 1 2 1 2 screw Hardware Step 52 S1 2 1 2 Screws x 1 total 52...

Page 32: ...osite side of cedar roof Attach with 4 2 1 2 screws Hardware Step 55 S1 2 1 2 Screws x 4 total 56 Roof Filler Shingles are included to cover roof seams Starting at the bottom slide the first Long shin...

Page 33: ...ows of Filler Shingles where roof seams meet in the same way Hardware Step 59 S2 1 1 4 Screws x 32 total Y2 90 Metal Bracket x 8 total 57 Screw first Filler Shingle down to rafters using 2 2 1 2 screw...

Page 34: ...ner Trim 2 Side Rear Bottom Skirting Bevel 6 Narrow Trims 4 Porch Door Trims 2 Narrow Filler Trims 2 60 To further secure roof panels from the inside drill 1 8 pilot holes in each mid rafter 3 per raf...

Page 35: ...l rest in the first channel of the Porch Ceiling Panel You will need a helper to hold the panel in place while you attach with 1 1 2 Finishing Nails 27 per side Attach one nail through both ends of ea...

Page 36: ...the base of the shed Skirting will hide floor framing Start with Front Skirting positioned flush with the top of the deck boards and the side of the floor frame Attach with 6 1 1 2 Finishing Nails pe...

Page 37: ...of the shed Bevel is thicker at butt and thin ner at top of board Skirting will hide floor framing Gaps on side will be covered by Narrow Wide Trim pieces later Start on side walls first and attach w...

Page 38: ...wards at top of wall tight against Soffits Attach with 4 1 1 2 Finishing Nails per piece Complete both sides Parts Steps 67 Top Wall Trim 1 2 x 1 1 2 x 45 1 4 x 4 Hardware Steps 67 N1 1 1 2 Finishing...

Page 39: ...ce Repeat for other opposite rear corner Parts Steps 69 Corner Trims 1 2 x 3 1 2 x 78 1 2 x 2 Wide Corner Trim 1 2 x 5 1 2 x 81 1 2 x 2 Hardware Steps 69 N1 1 1 2 Screws x 32 total 70 Position Narrow...

Page 40: ...cure with 8 1 1 2 Finishing Nails Parts Steps 72 Rear Wall Seam Trim 1 2 x 2 1 2 x 77 1 2 x 1 Hardware Steps 72 N1 1 1 2 Finishing Nails x 8 total 73 Attach both Porch Door Trims to front walls Secure...

Page 41: ...Detail Plate to cover trim seams Attach with 4 1 1 2 Finishing Nails per piece Small Plate Trim Plate Parts Steps 74 Porch Roof Seam Trim 1 2 x 2 1 2 x 45 7 8 x 2 Hardware Steps 74 N1 1 1 2 Finishing...

Page 42: ...ont Facia 2 Gusset Gable 1 Rear Facia 2 Post Base Trims 12 Handrail Section for Porch 1 Short Deck Post 1 Door Handle Drop Latch Door Stops 2 2 Vertical 1 Horizontal Facia Detail Plate 2 Window Insert...

Page 43: ...er of rafters tight underneath Facia Nailing Strips Covers should be approximately flush with the bottom of the Porch Roof the inside of the 4x4 Porch Post and the Rafter ends Attach with 4 1 1 2 Fini...

Page 44: ...n to help you correctly position Rear Facia before attaching Attach Rear Facia to Nailing Strips with 8 1 1 2 Finishing Nails per piece A small gap may appear where Rear Facias come together at peak T...

Page 45: ...acias come together at peak This gap will be covered in Step 84 82 Attach Side Facia to rafter ends There are 2 Facia pieces per side A small gap may appear between Facias which will be covered in Ste...

Page 46: ...tail Plate Pentagon Detail Plate Parts Steps 84 Facia Detail Plates x 2 Pentagon Detail Plates x 2 Large Detail Plate x 1 Hardware Steps 84 N1 1 1 2 Finishing Nails x 20 total Parts Steps 85 Short Dec...

Page 47: ...s 87 88 Roof Ridge Caps x 21 Ridge Cap Short x 1 Hardware Steps 87 88 N2 1 1 2 Shingle Nails x 42 total Alternate Ride Cap seams offsetting angle cut at peak Important Butt thick end of Ridge Cap will...

Page 48: ...Insert s outside flange and the siding Also put a bead of caulking horizontally at top of window where the flange and siding meet This additional caulking will also will reduce the chances of moistur...

Page 49: ...nd of trim Use 2 3 4 screws as above Top Door Bottom Door 2 Screws 3 4 Screws Parts Step 93 Dutch Door bottom x 1 Shim Shingles Hardware Step 93 SB2 2 Black Screws x 12 total 93 Place Bottom Dutch Doo...

Page 50: ...position Drop Latch correctly Important Drill pilot holes with 1 8 drill bit prior to securing to prevent wood from splitting Parts Step 94 Dutch Door Top x 1 Shim Shingles Hardware Step 94 SB2 2 Blac...

Page 51: ...al Stop Door Stops should overhang the door by approximately 1 2 Start with the Horizontal Stop first Parts Steps 96 Horizontal Door Stop 1 2 x 2 1 2 x 35 1 4 x 1 Vertical Door Stop 1 2 x 2 1 2 x 72 x...

Page 52: ...ts x 3 Hardware Step 99 S1 2 1 2 Screws x 6 total 99 Assemble Flower Box Kits with Assembly Instructions included on Page 53 Position completed Flower Box below bottom of window trim and secure with 2...

Page 53: ...ps 3 On a flat surface flip Flower Box on it s rear face Evenly space Brackets and secure through Base Frame and into the Brackets with 2 1 1 4 screws per Bracket Position completed Flower Box beneath...

Page 54: ...6 Overall Satisfaction Please call write or email us at We hope your experience constructing our building has been both positive and rewarding We value your feedback and would like to hear back from y...

Reviews: