72.
Attach
Facia / Detail Plate
to cover seams where Rear Facia pieces come
together. Secure with
4 - 1 1/2” Finishing Nails
.
71.
Position
Front Middle Trim
(1/2” x 2 1/2” x 6 1/4”) on wall seam in top front. Position as shown
above and attach with
3 - 1 1/2” Finishing Nails
.
70.
Place
Front Metal Ridge Caps (2 pieces - 60” long)
on top of metal roof in the front. Insert
Foam
Enclosures
underneath Ridge Caps Evenly space from side-to-side allowing caps to overlap each other.
Overhang the cap approximately 1” past each end. When ridge cap is correctly positioned, secure with
4 - 2” self tapping metal screws
as per
Step 48
. Screw into to top batten. Do not overtighten.
Foam Enclosures
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 36