41.
Center
Rafter/Facia Nailing Plates
(2) (3/4” x 3/4” x 51”) underneath outside of each batten.
Attach with 3 - 1 1/4” screws evenly spaced into the batten. The Rafter/Facia Nailing Plate provides
for a greater nailing surface later when you attach side facia.
42.
Locate all
Metal Roof Hangers
(3pcs)
and
Metal
Roof Panels
(3pcs - 39” wide x 58 1/2” long - Identical). To
temporarily help hold the
Metal Roof Panel
in place, hook
a
Metal Roof Hanger
onto the lower
Batten
approximately
where the center of the first Panel will be. Place the first
Metal Roof Panel
on
Battens
. Do not fasten Panels down
until
Steps 46 & 48
. Place other two
Metal Roof Panels
with Hangers the same way.
Metal Roof Hangers will temporarily
help keep Metal Roof Panels in
place before they are fastened.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 22