background image

10. 

Starting on side, position a 

Solid Wall Panel

 on top of plywood floor. 

The Wall Panel bottom framing will sit flush with floor framing. Wall siding will 
overhang the floor. 

Important:

 Make sure all walls are aligned in their 

upright position. If not, water may leak into your shed.  Unsure if panel is  
facing up or down? Recently attached Bottom Plate is on bottom of panel.

11. 

Outside 2x3 framing of wall panel should be  flush with outside of floor framing when properly 

aligned.  

Note:

 Do not align wall siding to floor. Align wall plate to outside of plywood floor. When 

positioned correctly, locate 2nd Solid Wall Panel and place in corner.

Wall Plate Flush 
with floor frame.

Do not align 
wall siding to 
floor. Align 
wall plate to 
outside of 
floor frame.

12. 

Butt both vertical wall studs of side and rear walls together and attach with 

3 - 2 1/2” Screws

.  

Screw at the bottom, middle and top of stud to secure properly. Have helper push wall framing 
together while securing to ensure tight fit.  

Note:  Drill pilot holes in studs to prevent splitting

.

Rear Solid W

all

Side Solid W

all

Do Not Attach Walls To 
Floor until Step 30. 

Optional 

-  Caulking 

seams will help prevent 
moisture from entering 
your shed. Caulking not 
included in kit.

 

Pilot Hole 

first.

W

all Plate

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 10

Summary of Contents for GS84-SLIDER-CEDAR-FJ

Page 1: ...be provided free of charge after the 30 day grace period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanship Costs incu...

Page 2: ...ide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manua...

Page 3: ...d of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 0 Cubic Yards of gravel requir...

Page 4: ...Facia Misc Parts 4 x 4 x 45 Bottom Skirting Bevel Siding 2 x 4 x 45 1 4 Front Bottom Skirting non Bevel Steps 47 49 6 3 4 x 2 x 36 Corner Filler Trims 2 3 4 x 2 x 36 Corner Filler Trims Front Left St...

Page 5: ...rill Tape Measure Hammer Wood Clamp Level Pliers Tools Required Not Provided 1 8 1 2 Drill Bits Utility Knife 90 Metal Bracket x 8 1 1 2 Finishing Nail 245 Pcs Black Hasp x 1 Roller Assembly x 2 Torx...

Page 6: ...s Brush off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour P...

Page 7: ...o flush with framing 2 When correctly positioned attach each Joist with 4 2 1 2 Screws 2 per end You can find the Square Drive Bit for the screws in with the Hardware Kit Bag Flush with framing Front...

Page 8: ...n not to bend or twist floor Note Having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads or patio stones positioned underneath t...

Page 9: ...re flush with framing Door Header Short Important Pilot hole ALL 2x3 Wall Studs with 1 8 drill bit prior to screwing This will make it much easier to attached together Pilot Hole first Extendor Wall C...

Page 10: ...ioned correctly locate 2nd Solid Wall Panel and place in corner Wall Plate Flush with floor frame Do not align wall siding to floor Align wall plate to outside of floor frame 12 Butt both vertical wal...

Page 11: ...attach both wall panel studs together as per Step 12 with 3 2 1 2 Screws 14 With Rear Wall Panel in place position other side wall panel on floor as per Step 10 11 Rear Wall Panel 15 Secure side wall...

Page 12: ...tach short header using 2 2 1 2 Screws as shown above 18 Locate Front Left Corner Filler Trims 2 3 4 x 2 1 2 x 36 and Door Jamb 1 1 2 x 3 3 8 x 73 Attach both Fillers with 4 1 1 2 Finishing Nails as s...

Page 13: ...l extendor and align as shown above Attach with 3 1 1 2 Finishing Nails to top wall framing There are left right top siding pieces Use rough surface side out Place finished wall extendor on side wall...

Page 14: ...extendor framing flush with inside edge of Header Overhanging siding on front of extendor will rest in notch of Header 1 4 recess 25 Attach Wall Extendor to both the Angled Wall Extendor framing and t...

Page 15: ...ear Wall framing To help strengthen the Rear Walls there is a short and a long wall cleat which meet off center from the seam between walls Attach Cleats with 8 1 1 4 Screws 27 With Extendor Walls att...

Page 16: ...now will make it easier to install roof section 99 1 4 29 Position and attach Front Right Corner Filler Trims 2 3 4 x 2 1 2 x 36 with 4 1 1 2 Finishing Nails per piece Attach Front Top Corner Filler T...

Page 17: ...tom 2x3 wall plates to plywood floor with 20 2 1 2 Screws Confirm Doorway opening is 44 wide Prior to securing make sure wall panels are aligned correctly on the floor Refer to Step 11 Wall siding sho...

Page 18: ...ve Measure and attach remaining Soffit Rafter connections using 2 1 1 4 screws per rafter soffit Front Soffit Boards 2 48 21 3 4 21 3 4 96 A B C Rear Soffit Mid Rafter Mid Rafter Rear Screw center raf...

Page 19: ...and Rear Soffits will sit approximately 1 8 away from wall siding This can vary slightly 32 Carefully flip completed Rafter Section over so Front Soffit is facing the front and place on GardenSaver w...

Page 20: ...l framing at front of shed and inside Rear Wall framing at rear of shed behind Horizontal Wall Cleats Front Front Shingle overhang In s id e S h in g le s fl u s h Outside Side 37 Carefully flip Roof...

Page 21: ...after end Plywood flush with shingles on inside 39 For correct Roof Panel position align panel so plywood sits evenly on Center Rafters Complete both roof Panels Roof Panel centered on rafter Roof Sea...

Page 22: ...t filler shingle down to rafters using 1 2 1 2 Screw per panel 2 in total Screw on slight angle and make sure to screw into rafter Screw slightly above 3rd row of shingles exposure line This way the s...

Page 23: ...ible have a helper push roof panel down so plywood sits flush against rafter while securing Mid Rafter Plywood 3 2 1 2 screws Toe Nailed in each Mid Rafter 44 Slide 3rd and 4th Filler Shingles up and...

Page 24: ...th 4 1 1 2 Finishing Nails per piece Roof Ridge Boards 2 Side Front Corner Trim 2 Front Corner Trim 2 Side Rear Skirting 4 Front Rear Facia Detail Plates 2 Front Facia 2 Front Middle Trim Front Bottom...

Page 25: ...tached later There will be two 36 long fillers per corner Position with a slight gap in the middle and attach with 4 1 1 2 Finishing Nails per piece Skirting meets flush in center Skirting meets flush...

Page 26: ...e same 5 1 2 Side Skirting 53 To completely trim out rear corners locate Side Rear Corner Trims 1 2 x 2 1 2 x 80 and Rear Corner Trims 1 2 x 5 1 2 x 79 Align and attach as per Step 52 51 To Trim out f...

Page 27: ...with 8 1 1 2 Finishing Nails aligning tight underneath soffit and center on seam 55 Locate Aluminum Door Track and position above doorway evenly spaced between wide front corner trim Ensure Track is...

Page 28: ...rew per bracket to hold in place Attach 2nd bracket with another 1 1 2 Torx Screw Check level once again Complete attachment of remaining Torx Screws on brackets of Track 57 Locate Sliding Door and fl...

Page 29: ...2 1 2 12 1 2 58 Locate Roller Assemblies Before attaching to top of doors assemble the units as shown above Attach two Roller Assemblies onto door with 4 1 1 4 Screws per Assembly center on the door f...

Page 30: ...r Door Tracks and Door Stops Center Door Track side to side and resting on Long Floor Runners Bottom of Door Stops and Door Tracks should be flush with each other Secure Door Tracks to shed with 9 3 s...

Page 31: ...ill attachments IMPORTANT Slide door back and forth to confirm door slides freely prior to attaching Top Track Overlay Track Brackets are slotted so door position can be adjusted horizontally as well...

Page 32: ...rack Check level before securing with 6 4 Screws Edge of overlay has been pre drilled for screws 64 Locate Top Track Overlay Front 3 4 x 5 1 2 x 87 3 4 Position front overlay underneath sill Attach wi...

Page 33: ...cia and then attach the front with 6 1 1 2 Finishing Nails Attach side with 5 1 1 2 Finishing Nails securing them into the nailing strip closer to the top of the side facia board Attach next piece of...

Page 34: ...2 Finishing Nails per piece 70 Attach Facia Detail Plates to cover seams where Front and Rear Facia pieces come together Secure with 4 1 1 2 Finishing Nails per piece 69 Position Front Middle Trim 1...

Page 35: ...1 4 Screws Caulk gap between siding and window at top This requires a large amount of caulking but is important to fill Later Window Trims will be installed to hide caulking 72 Position Window Trim a...

Page 36: ...me Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copie...

Reviews: