Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 26
48.
Locate 2
Vertical Door Frame Trims.
Position on Front Narrow Wall flush with Wall siding/
framing and underneath Front Header Filler Strip. Attach with
6 - 1 1/2” Finishing Nails.
Flush with Siding/
Wall Framing
Parts
Vertical Door Frame Trims
(1/2” x 2 1/2” x 64 1/4”)
x 2
Hardware
1 1/2” Finishing Nails
x 12 total
49.
Locate
Door Threshold
and position on Floor at the opening. Align tip of the bevel flush with
the outside of the Bottom Wall Plate. Attach with
4 - 1 1/4” Brown Screws.
Butt
Tip
2 5/8”
Flush
Parts
Door Threshold (Bevel)
(1/2” x 2 5/8” x 44 7/8”)
Hardware
1 1/4” Brown Screws
x 4 total
47.
Complete other Rear Corner, Side Fascia
and Front Corner Trims as per
Steps 42 - 44.
Parts
Rear Wide Corner Trim
(1/2” x 3 1/2” x 67 3/4”)
Rear Side Corner Trim (Angle Cut At Top)
(1/2” x 2 1/2” x 65 1/2”)
Side Fascia Trim (Angle Cut Both Ends)
(1/2” x 2 1/2” x 37 5/8”)
Front Wide Corner Trim
(1/2” x 3 1/2” x 70 3/8”)
Front Side Corner Trim (Angle Cut At Top)
(1/2” x 2 1/2” x 70 3/8”)
Hardware
1 1/2” Finishing Nails
x 28 total