51.
Place
4L & 4M - Front Corner Trims
in front corner and align as
illustrated above. Do a dry run prior to attaching to achieve best fit. Start
with 5 1/2” wide Front Corner Trim and align tight underneath soffit to
determine vertical height. Attach with
8 - 1 1/2” Finishing Nails
per
piece. Position and attach Side Front Corner Trim (2 1/2” wide) using
8 - 1 1/2” Finishing Nails
, aligning at bottom with wide trim.
Parts
4L - Front Corner Trims
(1/2” x 5 1/2” x 88 3/4”)
x 2
4M - Side Front Corner Trims
(1/2” x 2 1/2” x 88 3/4”)
x 2
Hardware
N1 - 1 1/2” Finishing Nails
x 32 total
5 1/2”
tight underneath
soffit.
50.
Position
4KD -
Track Overlay - Sill
pieces evenly on top of Track
Overlay with the slope facing away from the shed. This will prevent
rainwater from collecting on top. Attach with
3 - 1 1/2” Finishing Nails
per piece. Hammer carefully and support the Track Overlay from below
if necessary to avoid knocking it loose.
Parts
4KD - Track Overlay - Sill (Bevel)
(1/2” x 4 1/4” x 44 1/4”)
x 3
Hardware
N1 - 1 1/2” Finishing Nails
x 9 total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 34