**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the 

correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

01DTOVPN0705SDFW-V1

DIP TREATED OVERLAP PENT 7X5 SINGLE DOOR FIXED WINDOW

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

P 1

Please retain product label and instructions for future reference

             

General Instructions

Содержание 01DTOVPN0705SDFW-V1

Страница 1: ...placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately t...

Страница 2: ...1 QTY 1 AI R11OVPP896X1799 V1 Plain Panel 2 QTY 1 AI R11OVPP1180X1799 V1 8 9 23 T Hinge QTY 3 PI 07 0021 Felt QTY 1 PI 01 0013 L Bracket QTY 2 PI 07 0012 Turn Button QTY 2 PI 07 0034 Hasp and Staple QTY 1 PI 07 0207 24 25 22 21 Door Beading Strip 12x28x1720mm QTY 2 S1228 1720mm 17 26 Styrene QTY 1 PI 05 0114 Window Cill QTY 1 PI 08 0012 Window Cover Trims 12x28x533mm QTY 2 S1228 533mm 18 Window Co...

Страница 3: ...the Right PLEASE NOTE Before fitting the hinges ensure the door is in the correct position depending on which side you want the door to open See external illustrations below which show the doors internal framing Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver a...

Страница 4: ...ted 6x50mm Screws Pre drill hole 50mm screw Step 4 Parts Needed No 2 QTY 1 No 6 QTY 1 2 6 a a a a a a a a a a a a a a a a 1 3 Pre drill hole 50mm screw Step 5 Parts Needed No 1 QTY 1 No 3 QTY 1 a Place the Right Gable No 3 and the Door Panel No 1 onto the floor Fix the Panels together with 3x50mm screws at each join as shown in diagram Do not secure the building to the floor until the roof is fitt...

Страница 5: ...r each sheet 40mm screw Pre drill hole 8 11 30mm screw Step 7 Parts Needed No 8 QTY 1 No 11 QTY 1 Once the roof is fixed attach the building to the floor with 50 mm screws 22x 50mm Screws 50mm screw Pre drill hole b b b b b b b b b b b b b Step 8 1 2 HANDLE WITH CARE 1 2 3 4 Cut the felt No 25 into 2x 2210mm long sheets and lay onto roof as shown in diagram ensuring there is overhang around the si...

Страница 6: ...30mm screws per strip 17x30mm Screws Pre drill hole 30mm screw a b c 20 20 27 a b c d d SILIC O N E SEA LA N T 26 18 Styrene Window Cill Cladding Side View 18 19 15 15 15 16 16 16 Pre drill hole 30mm screw 14 13 14 P 6 Please retain product label and instructions for future reference Step 10 Parts Needed No 18 QTY 2 No 19 QTY 1 No 20 QTY 2 No 26 QTY 1 No 27 QTY 1 Step 11 Parts Needed No 15 QTY 3 N...

Страница 7: ...he door cladding and into the door block 10x30mm Screws 17 17 17 Pre drill hole 50mm screw Step 14 Parts Needed No 22 QTY 2 No 24 QTY 1 Fix the Turn Buttons No 22 to the door panel ensuing that the turn buttons catch the door secure using 2x30mm screws Fix the Hasp and Staple No 24 onto the door and door panel secure using 7x30mm screws ensuring the screws go through the framing 8x30mm Screws 12 1...

Страница 8: ...P 8 2 1 3 4 ...

Страница 9: ...P 9 1 2 ...

Отзывы: