38.
Screw first filler shingle down to rafters using
1 - 2 1/2” Screw
per panel
(2 in total). Screw on slight angle and make sure to screw into rafter. Screw
slightly above 3rd row of shingles (exposure line). This way, the screw will get
covered up when you install your 2nd Filler Shingle and will prevent leaking.
Do both roof seams the same.
Hardware (Steps 38 - 40)
S1
- 2 1/2” Screws
x 16 total
3rd Shingle Row
2nd Filler
Shingle.
4th Shingle Row
39.
Slide 2nd
Filler Shingle
up and underneath fourth shingle row. Follow
Steps 37 - 38
to align and
attach. Repeat for other roof seam.
40.
Slide 3rd and 4th
Filler Shingles
up and underneath appropriate shingle rows and follow
Steps 37 - 39
to align and attach. On last filler, screws will get covered by Roof Ridge Board (4 1/2” wide).
Attach above
the exposure
line.
Exposure
Line.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25