37.
Center Facia Nailing Strip (underneath outside of each
batten. Attach with
3 - 1 1/4” Screws
evenly spaced into the
batten. The Facia Nailing Strip provides for a greater nailing
surface later when you attach side facia.
Parts
3J - Nailing Strips
(3/4” x 3/4” x 51”)
x 2
Hardware
S2
- 1 1/4” Screws
x 6 total
Metal Roof Hangers will temporarily
help keep Metal Roof Panels in
place before they are fastened.
Parts
3K
- Metal Roof Panels
(39” x 58 1/2”)
x 5
Hardware
Y38
- Metal Roof
Hangers
x 5 total
38.
Locate all
Metal Roof Hangers
and
Metal
Roof Panels
(Identical). To temporarily help hold
the
Metal Roof Panel
in place, hook a
Metal Roof
Hanger
onto the lower
Batten
approximately
where the center of the first Panel will be. Place the
first
Metal Roof Panel
on
Battens
. Do not fasten
Panels down until
Steps 40 & 42
. Place other two
Metal Roof Panels
with Hangers the same way.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25