Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9
16.
Locate 2nd Post and Plywood Post Spacing Template. Align and secure Post to Joist Assembly
as per
Steps 12-15.
Using the Post Spacing Template, slide between posts as illustrated above.
17.
Locate one Outer Rim Joist (1” x 5 1/2” x 48 3/4”) and position evenly from side to side between each
Post. Level Rim Joist with top of “T” Post Mount. Screw Rim Joist to Post with 2 - 3” screws.
2nd Post
Plywood Post
Spacing Template
Push posts together
tight against Template.
18.
Before attaching opposite end of Rim Joist to Post, push Post tight against Template and then
attach Rim Joist to Post with 2 - 3” screws. Line up Mid Joist with Mid Joist Template Marker and
when correctly centered attach Mid Joist to Rim Joist with 1 - 3” screw.
Line up
Mid Joist
with
Template
Marker.
1 - 3”
screw into
Mid Rafter.
Level with top of “T”
Post Mount. See
Step 23.
Door Way