Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17
42.
When correctly positioned, attach with 4 - 2” screws. Complete all Handrail Sections now.
Important-
Drill 1/8” Pilot Holes in End Caps to prevent splitting. Be sure to drill into Handrails.
43.
Starting on right side of Doorway, position first Handrail Section between Posts. Position bottom of
Handrail Section 4 1/2” above top of the Rim Joist. Position End Cap of Handrail Section equally from front
to rear or best fit on Post.
44.
With Handrail Section positioned correctly, screw End Cap to Posts with 3 - 2” screws per side.
Position and secure a second Handrail Section between Posts moving Counter Clockwise
direction. Once again, use 3 - 2” screws per side to secure.
Doorway
Measure 4 1/2” from
top of Rim Joist.