50.
Place first
Roof Ridge Cap (Part 3J)
on roof peak overhanging shingles by approximately 2”.
Attach with
2 - 7/8” Shingle Nails (Part N)
9” from end. Place 2nd
Ridge Cap
1” back from 1st
cap. Attach with
2 - 7/8” Shingle Nails (Part N)
9” from end.
51.
Place 3rd
Ridge Cap
8” back from 2nd (enough to cover shingle
nails). Attach 3rd ridge cap down as per
Step 50
. Continue to position and
attach ridge caps until half roof is complete. From opposite side, position
and attach ridge caps as described above. Score/cut 1 ridge cap to 12” or
to fit in the center of roof. Attach center cap with
4 - 7/8” Shingle Nails
(Part N)
.
9” from end
8”
8”
Important:
Butt (thick)
end of Ridge Cap will
be facing towards the
outside of shed.
49.
Slide in next long filler shingle and attach with
2 - 2 1/2” screws (Part B)
as
per
Step 48.
Slide in remaining
Filler Shingles (Part 3H & 3I)
and attach in order.
The top
Filler Shingle (Part 3I)
is shorter.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 24