46.
Screw panel down at top only with
1 - 2 1/2” screws (Part B).
Place second roof panel on rafters.
Align and attach. Roof will be completely secured in later Steps. Do not attach further until
Step 48.
48.
Slide in
Long Filler Shingle (Part 3F).
Attach filler and roof above exposure line with
1 - 2 1/2” Screw (Part B). Only attach first long filler shingle at this point.
1 screw at top into
ridge board.
47.
Position and attach
front side roof panels as
per
Steps 44-46.
If Roof Panels do not
align, check square of
shed at top wall and
adjust to square if
necessary.
1 screw in each
panel above
exposure line
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 23