![OLT 12x8 Studio Garden Assembly Manual Download Page 25](http://html.mh-extra.com/html/olt/12x8-studio-garden/12x8-studio-garden_assembly-manual_732290025.webp)
1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25
Front Roof
Rear Roof
Rafter
Plywood sitting evenly
on 1 - 2x4 rafter.
Rafter
Spacer
48”
Middle Front.
Even
52.
Line up roof plywood sheathing of front and rear roof panels. Plywood should sit even at bottom of
rafter and even on 1 - 2x4 rafter.
53.
Locate Front Middle Roof Panel and slide up on to the 3rd and 5th Rafters. Line plywood roof
sheathing similar to
Step 50
. Middle panels are cut so plywood and shingles are flush on both sides and
can sit evenly on rafters. Line up plywood evenly with end of rafters at the front.
Plywood even
with end of rafter.