![OLT 12x8 Studio Garden Assembly Manual Download Page 13](http://html.mh-extra.com/html/olt/12x8-studio-garden/12x8-studio-garden_assembly-manual_732290013.webp)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 13
Top Plates should be flush
with inside of wall framing.
Rear
Main front plates
installed in Step 30.
22.
Attach both
2D - Main Wall Rear Top
Plates
with
4 - 2” screws
per piece. Complete
remaining side wall plates as per
Step 21.
Parts
2D - Main Wall Rear Top Plates
(3/4” x 2 1/2” x 65 3/4”)
x 2
Hardware
S3 - 2” Screws
x 8 total
21.
Position
2D
&
2F - Main Wall Side Top Plates
on top of wall
studs so they are flush on the inside with 2x3 wall stud. There are
2 plates per side - 1 long & 1 short. Attach by screwing down into top
wall framing with
4 - 2” Screws
per long plate &
3 - 2” Screws
per
short plate.
Parts
2D - Main Wall Side Top Plates
(3/4” x 2 1/2” x 65 3/4”)
x 2
2F - Main Wall Side Top Plates
(3/4” x 2 1/2” x 27 3/4”)
x 2
Hardware
(
S3 - 2” Screws
) x 14 total
2” Screw