E
D
pre-marked for Stub
Joist placement
Notches facing down
9.
With Stub Joist positioned correctly on Joist,
attach with 2 - 2 1/2” screws. Stub Joists should
be flush with top and bottom of Main Joist with
all notches facing down.
Lag screw into
Pre-Drilled Holes.
Girders
flush on top.
6.
Carefully slide C-Girder down into notch
of B-Girders. Be careful not to twist the
Girder when pushing up into place. Lag
Screw with Washers (2) the C-Girder to
Post when both pieces are flush with each
other.
7.
Lift, position and Lag
screw the opposite
C-Girder to Posts.
8.
On level ground, position 1
Joist (D)
and
1
Stub Joists (E).
Joists are pre-marked for Stub Joist and Blocking
position.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 6