background image

PAGE 7

2.0 INSTALLATION INSTRUCTIONS

2.2 - Installation Notes & Guide

Attention should be paid to the following during and before the installation:
In the first step, the location and the way of connection of the purchased appliance has to be chosen with 
consideration of the safety instructions. 

The chimney must be suitable for operating your stove.

Installation and usage of stoves must be reported to a competent chimney sweep or another competent 
expert. Applying the local regulations a chimney sweep/expert has to issue a written authorization to use 
the stove. Ensure to get a receipt of this to certify.

Examination of the chimney happens according to the local rules which are usually national or European 
standards.

The local rules should be taken into consideration during the installation of the connecting pipe as well. 
These  are  usually  national  or  European  standards.  Necessary  air  supply  for  sufficient  burning  has  to  be 
ensured. In hermetically insulated rooms a separate air inlet pipe is needed to guarantee a sufficient supply 
of air for the operation of the stove. It is also necessary in the case of rooms with forced aeration systems 
(e/g extractor fan).

If  it  is  possible  a  solution  must  be  found  for  turning  off  these  appliances.  Some  Olsberg  stoves  have  an 
optional connection for an external air inlet.

Use of Olsberg stoves in building with hermetic insulation and mechanical airing systems is only allowed 
under certain conditions. Authorization of the stove as “independent of the air in the room” and insulated 
air inlet from outside are among these conditions. It is important to consult a competent chimney sweep or 
expert regarding this matter.

Choose a location for the stove close to the chimney to prevent the use of a long horizontal connecting pipe. 
The location of installation has to be flat and level. Make sure that the floor has the necessary load-bearing 
capacity. The weight of the appliance can be found on the technical data sheet. In case the load bearing 
capacity of the floor is too low, usage of a plate for better load distribution might help. If the problem exists 
you should seek professional help.

2.1 - Heating Capacity - Installation Guide

This appliance must be installed by a competent person and the installation must comply with bs8303 – 
code of practice for installation of domestic heating and cooking appliances burning solid mineral fuel, 
national building regulations, local by-laws and standards and the requirements of the health and safety at 
work act - in particular: 
Handling: 

Adequate facilities must be available for loading, unloading and site handling.

Fire cement:

Some types are caustic and should not be allowed to come into contact with the skin. In case of contact 
wash immediately with plenty of water.

Asbestos: 

These stoves contain no asbestos. If there is a possibility of disturbing any asbestos in the course of 
installation then please seek the guidance of a specialist and use appropriate protective equipment.

Metal parts:

When installing or servicing this stove care should be taken to avoid the possibility of personal injury

Summary of Contents for PENMAN PULAR

Page 1: ...INSTRUCTION MANUAL OLSBERG PULAR COMPACT DIN EN 13240 DIN 18897 raumluftunabh ngig DIBt Bauaufsichtliche Zulassung 15a BV G INSTALLATION INSTRUCTIONS OLSBERG PULAR CYLINDRICAL STOVE...

Page 2: ...PAGE 2...

Page 3: ...10 3 1 General Information 3 2 Suitable Fuels 3 3 Reducing Emissions 3 4 Lighting the for the first time 3 5 After Use Maintining the perfect burn 3 6 Operating The Air Slide Valve 3 7 Operating the...

Page 4: ...e the rest of the fuel burns up in the second phase of the combustion process This process is characterized by strongly glowing embers with no or only smaller temporary flames Optimal and environmenta...

Page 5: ...Pa can lead to uncontrollable combustion process that can damage the appliance itself the connecting pipe and the chimney sweep or a competent expert about finding a solution In such cases we recommen...

Page 6: ...ch its surface to prevent damage of lacquering Use protective gloves for your own protection and for the sake of the intactness of the lacquering The doors of the stove should be kept slightly open du...

Page 7: ...ditions Authorization of the stove as independent of the air in the room and insulated air inlet from outside are among these conditions It is important to consult a competent chimney sweep or expert...

Page 8: ...eeve and the sealing cover Decide where the stove is to be installed There must be no objects made of combustible materials within a dis tance of 80 cm of the stove s radiation area measured from the...

Page 9: ...horizontal connecting valves Incase of stoves with a capacity of 6kW the minimum length of the vertical connecting pipe is 50cm We recommend the use of an insert with a double wall for connecting to t...

Page 10: ...uel according to heat demand The heating value of 1kg of dry wood is 4 4 5kW This means you can place about 2 4kg of wood into a stove of 8kW capacity every hour When burning wood if a lower capacity...

Page 11: ...ant to load more fuel and only if the previous amount has burned down to embers The condition of proper operation of the stove is the appropriate chimney draught feed pressure This is considerably dep...

Page 12: ...g lever for the fire grate With the help of the operating lever the fire grate can be opened or closed to move the ash from the combus tion chamber to the ash pan by pushing the fire grate back and fo...

Page 13: ...Regulation of combustion air Position of operating lever II Ignition position max heat output I Nominal heat output with billet wood I Nominal heat output with wood briquettes 0 Obtain glow As the se...

Page 14: ...Use only a small amount of fuel at first Use only a small amount of fuel when reloading Riddle Grate What are the causes There is no proper draught at heating up Chimney or stove pipe is not closed pr...

Page 15: ...re made of materials of excellent quality There s continuous control through the manufacturing procedures and the finished stove is subjected to stringent quality control 5 0 SPECIAL NOTES WHAT FREQUE...

Page 16: ...PAGE 16 APPENDIX 1 DIMENSIONAL DRAWINGS 147 147 1218 472 472...

Page 17: ...PAGE 17 BLANK...

Page 18: ...PAGE 18 BLANK...

Page 19: ......

Page 20: ...Brought to you by Imperial Point Express Trading Estate Stone Hill Road Farnworth Bolton BL4 9TN Tel 01204 868 550 Fax 01204 868 551 Email sales percydoughty com www visionfires co uk...

Reviews: