background image

  

LB51100 Installation and User Manual 

16 

Shenzhen Olipower Energy & Automation Technology., Ltd 

 

 

down normally. 

6.2.3

 

Low battery forced charge function 

Prerequisite: When the battery voltage is too low, it will go into the shutdown state automatically. Meanwhile, the 

voltage between the battery box B + and B- is zero and the panel lights are off. when push the power button, the 

battery run(green) LED is on ,low battery(yellow) LED is on, fault(red) LED is flashing, if the fault(red) LED still 

flashing after 3 minutes, means the battery into ultra-low battery, in ultra-low power to recharge battery can only 

use forced charge function. 

Preparation condition before forced charging: Connect the charger or the inverter with charging capability to the 

B+ and B- of the battery box to ensure charging capacity. 

Forced charging step: 

Step 1: Make sure the battery is in ultra-low power, please refer to "Prerequisites". 

Step 2: If the battery is off, please turn on the battery and observe whether the status of the battery indicator is 

run(green) LED is on, the low power(yellow) LED is on, the fault(red) LED is flashing. if it is ,do next step operating. 

(If no operation is performed for five minutes from the moment you push the power button, the battery will turn off 

again.) 

Step 3: Push the power button (1-2S) again, if the run(green) LED is flashing, the low power(yellow) LED is on, 

the fault(red) LED is on, means the battery into forces charge state. 

Step 4: After entering the forced charge state, you have 90S of time to prepare for charging. battery is detected 

charging during this 90S, the fault (red) is off, run LED no longer flashing (just on) after 90S, means the battery into 

the normal charging mode. the battery is not detected charging after 90S,the fault(red) LED will flashing, the battery 

cannot be recharged in this time, you can only start the forced charging operation from the beginning (if no operation 

within 5 minutes, the battery will enter the shutdown state).

 

6.3

 

The steps of the battery boxes work in parallel 

6.3.1

 

Cautions before Parallel: 

(1)

 

The battery boxes voltage difference must not be greater than 2V. Otherwise, the battery boxes are not 

allowed for parallel connection. 

(2)

 

The connection between the battery boxes and the parallel box is ready. 

(3)

 

Before activity the system, operator should check the cable connection strictly till make sure of the LINK 

cable connection is hard, and check the batteries DIP switch had been setup correctly. 

6.3.2

 

Activate the parallel batteries system 

Step 1, short press the master battery box power button(1S), the master battery box RUN light on, the master 

battery box is activated. 

Step 2, short press the slave battery box 1 power button (1S), the slave battery box 1 RUN light on, the slave 

battery box 1 is activated. 

Step 3, If parallel with three battery boxes, please short press slave battery box 2 power button(1S), the slave 

battery box 2 RUN light on, the slave battery box 2 is activated. Switch on dc isolators between battery and 

inverter, and between batteries. 

Finally, all battery boxes are activated, and the parallel batteries system is properly powered on. 

 

6.3.3

 

The parallel Batteries system shutdown 

Switch off dc isolators between battery and inverter, and between batteries. Long press the master battery box 

power button (5s), the master battery box RUN light immediately extinguished, slave battery boxes RUN lights 

Summary of Contents for LB51100

Page 1: ...LB51100 Installation and User Manual 1 Shenzhen Olipower Energy Automation Technology Ltd LB51100 Installation and User Manual Version V1 0...

Page 2: ...Introduction 6 4 2 Identifying The Product 6 4 3 Maintenance and Replacement 6 5 System Installation 7 5 1 Installation notice 7 5 2 Package information and system configuration list 7 5 2 1 Parts li...

Page 3: ...Battery box activate and shutdown 14 6 1 Panel buttons and LEDs meaning 14 6 2 The operation steps of the battery box works alone 14 6 2 1 Start battery box 14 6 2 2 Shut down battery box 14 6 2 3 Lo...

Page 4: ...Shenzhen Olipower Energy Automation Technology Ltd Due to product upgrades or other reasons this document will make appropriate adjustments Unless otherwise agreed this document is intended to be used...

Page 5: ...s Manual This is the Manual for the low voltage 48V residential rack battery products User of this device or installer must refer to the installation guidance to installation and using correctly 2 2 U...

Page 6: ...following precautions is not fully understood or has any problems please contact the customer service officer for assistance The safety part may not include all the regulations in your area The use of...

Page 7: ...ill the regulations and legal enquiry The user has the responsibility and obligation to send it to the designated organization for recycling and disposal 5 System Installation 5 1 Installation notice...

Page 8: ...ed in cartons and the components assort with the battery case When you confirm the good s please read the configuration list carefully to make sure that the battery box and kit are intact 5 2 1 Parts...

Page 9: ...e to side along the wall until the mounting card on the battery box is placed in the proper position of the rack mounting position Information Rack mounted installation is suggested that the external...

Page 10: ...as a parallel battery B B Battery negative The two negative are the same one of which can be used as a parallel battery B Attention B interface RJ45 port corresponding to the CAN bus pin definition R...

Page 11: ...drawing is for reference only please take the material as the standard It is an Australia installation standard requirement AS NZS 5139 that an overcurrent protection and isolation device that operat...

Page 12: ...tch after the need to restart the battery box restart the settings will take effect Single battery box through the LINK communication connection to the inverter when the address DIP switch defined as...

Page 13: ...1 and slave battery box 2 if have slave battery box 2 Step 4 After the battery is completed in parallel it is suggested that you wait a few minutes to connect the inverter later 5 4 3 2 The connection...

Page 14: ...the DIP switch is defined as follows CAUTION Set the DIP switch after the need to restart the battery box restart the settings will take effect Three battery boxes in parallel when the DIP switch is...

Page 15: ...FF Turn on or off button Control battery box on or off RUN Running indicator light green When the battery box is running normally it always bright LOW BAT Low battery indicator yellow When the battery...

Page 16: ...off run LED no longer flashing just on after 90S means the battery into the normal charging mode the battery is not detected charging after 90S the fault red LED will flashing the battery cannot be r...

Page 17: ...attery box and the inverter is normal When the battery box is running fault indicator lights up The battery is too high The battery must be stopped charging immediately Check the communication between...

Page 18: ...t Short circuit cause damage of battery box fuse Check whether the connection is correct and whether there is a short circuit If there is a short circuit please check the cause as soon as possible and...

Page 19: ...weight 46 2kg Installation method Rack mounting Cycle times 80 DOD 25 4000 Charge temperature range 0 55 Discharge temperature range 20 55 communication interface CAN2 0 LINK Modbus RS485 Battery pro...

Page 20: ...LB51100 Installation and User Manual 20 Shenzhen Olipower Energy Automation Technology Ltd Appendix 2 Product size table Product model Outline dimension LB51100...

Reviews: