9
Application foil
At least two people and a stepladder are needed to apply the foil.
1
.
Unwrap the foiland make sure that the zipper is on the front side.
2
.
Open both zippers to 20 cm.
3
.
Place the foil on the roof and align it so that the foil can be pulled down at the
corners.
4
.
Start with the backmost corners and pull the foil down.
5
.
Pull the foil down at the front corners.
6
.
Check the orientation of the foil and adjust it if necessary.
7
.
Once the foil is aligned, it can be fixed with the twist locks.
1. Attach the foil to the outer tank.
2. Fix the foil with the twist locks.
No. 18 (1x)
A rope can be pulled through the eyelets on site for securing.
CAUTION
To ensure protection from the weather, the foil must always be closed.
9 Application foil
27
Installation manual
Summary of Contents for Flexilo
Page 1: ...Installation manual Pellet Outside Storage ENGLISH PE729EN...
Page 31: ......
Page 32: ......