14 / 36
4.2 ASSEMBLING THE DETECTOR
Please follow the following instruction to assemble your detector and get ready for your first
measurement.
1
Make sure to recharge the internal bat-
tery of the detector before going into the
field.
Alternatively, you can use the Power Pack
to recharge the detector.
The Power Pack is optionally available
(not included in the standard delivery
scope).
2
Either connect the Standard Probe or the Super Sensor to the Sensor Socket.
The probe is used to measure the underground values and needs to be connected to
the socket on the bottom of the unit.
Push the plug into the Sensor Socket until the notch snaps in. There is only one cor-
rect direction possible to connect the probe properly.
Avoid hard impact or other damages!
Summary of Contents for ROVER C4
Page 15: ...15 36 OPERATING MODES ...