22
Assembly
Now you have to repeat the whole process for the second
telescopic shaft as well.
First push the second shaft into the mounting socket for
telescopic shaft that is situated on the back part of the Gepard
GPR.
Next, connect the short end of the second shaft’s cable to the
connector for receiving antenna that is marked with a silver
label (receiving port).
At the end of this process both cables are connected to the
connector panel of the Gepard GPR.
Now you can continue to mount the antennas to the telescopic
shafts.
The lower part of the shafts have a small notch that is used to
grab the antennas.
Push the notch of the first shaft, that has been connected with
the transmitting port, right over the bolt of the transmitting
antenna (red marking). Then close the eccentric strap (short
lever at the side of the bolt) to tighten the grip.
OKM GmbH