background image

5. Lift one side of the tent and attach the legs (with base plates) and insert the pins. It is recommended that two people be available 

when lifting the frame to install legs.

6) Push the square mast up through the 4-way crown 

from the bottom.

7) Push the removeable mast top into the hole in the 

center of the tent, then insert the top piece back into the 

mast and secure with a canopy pin

8) Push the mast up until the holes in the bottom of 

mast align with the holes in the bottom of the 4-way 
crown

.

9) Secure mast to the 4-way crown with canopy pins.

Reviews: