CHAPTER 3 REPAIR PROCEDURES
Ohaus Corporation www.ohaus.com
3-12
EB Series Scales Service Manual
3.5 REPLACING THE LOAD CELL COMPONENT
continued
7. Position the Load Cell and Frame in the Bottom Housing and install the four
retaining screws through the Frame into the Bottom Housing. See Figure 3-16.
Figure 3-16. Load Cell Frame Mounting Bolt Locations.
8. Install a cable clamp holding the Load Cell cable on the bottom of the Frame
assembly to the other wires in the Housing.
9. Proceed to section 3.5.1 and set the overload stops.
3.5.1 Overload Protection Stop Adjustment
When a Load Cell has been replaced in the existing Load Cell frame, the Overload Protection
Stops must be set before calibrating or testing the scale. This will require the use of mm feeler
gauges ranging from 0.6 to 1.6 mm and masses. See Table 3-2.
1. At each Overload Stop Protection location, insert the proper feeler gauge as
specified in Table 3-2.
2. With the correct feeler gauge positioned in the first Overload Protection Stop, press
down on the Frame and see if there is movement of the frame. Adjust the Overload
Protection Stop until there is no movement with the feeler gauge inserted. The
resulting gap should be the thickness of the feeler gauge. Do all four stops and
recheck until settings are correct.
Figure 3-17. Overload Stop Locations.
Retaining
Screw
Tie Wrap
Adjusting Screw
Gap
Locking Nut
Adjusting Screw
Locking Nut
Summary of Contents for EB SERIES
Page 2: ......
Page 4: ......
Page 8: ...TABLE OF CONTENTS Ohaus Corporation www ohaus com iv EB Series Scales Service Manual...
Page 52: ......
Page 53: ...80251392 P N 80251392 D SERVICE MANUAL EB SERIES SCALES...