Ohaus Corporation www.ohaus.com
20
Defender
™ Series Bases Service Manual
4.5.3 Full Load Test
1.
After the Off Center Load Test has been passed, test the Base’s full capacity according to
the Specification Table 1-1. The Base must meet all specifications as listed.
2. If the Base fails the Full Load Test, check and set the Down Stops.
(See Section 3.3.)
ATTENTION:
In all cases where a part is replaced, the base must be thoroughly checked after
the replacement is made. The base
MUST
meet the parameters of all applicable
specifications in this manual.
If further technical information is needed, please contact an authorized Ohaus Service Agent. For Service
assistance in the United States, call toll-free 1-800-526-0659 between 8:00 AM and 5:00 PM Eastern Standard
Time. An Ohaus Product Service Specialist will be available to assist you. Outside the USA, please visit our
website www.ohaus.com to locate the Ohaus office nearest you.