Hay Runner™ Hay Rake
33
Ogden Metalworks, Inc. — 217-582-2552
3. Grease the wheel rake arm pivot pins.
4. Grease the wheel rake hubs.
5. Grease the rake arm pivot shaft.
9.8 Inspection
1. Periodically check the spindle retaining bolt to
make sure it is tight.
2. Check the hydraulic hoses periodically for cracks,
abrasions or leaks. Replace defective hoses
immediately with factory replacement parts only.
3. Check tightness of lug bolts after one hour
of operation and every six months thereafter.
Check tire pressure whenever maintenance is
performed.
Summary of Contents for RCR812
Page 2: ......
Page 15: ...Hay Runner Hay Rake 13 Ogden Metalworks Inc 217 582 2552 5 6 ...
Page 40: ...Ogden Metalworks Inc 217 582 2552 38 Hay Runner Hay Rake 11 2 Wheel Rake Frame ...
Page 44: ...Ogden Metalworks Inc 217 582 2552 42 Hay Runner Hay Rake 11 5 Single and Tandem Axles ...
Page 49: ...Hay Runner Hay Rake 47 Ogden Metalworks Inc 217 582 2552 NOTES ...
Page 50: ...Ogden Metalworks Inc 217 582 2552 48 Hay Runner Hay Rake NOTES ...
Page 51: ......