PART # 1609113
FOOT RAIL ASSEMBLY FOR TWO-PIECE TOP
INSTALLATION INSTRUCTIONS
ELEVEN WOOD
1. Begin by locating the (2) holes bored on the bottom of the cross rail on the end legs. Insert a cross dowel
into the hole, making sure the slotted end of the cross dowel is facing towards you. Next, insert the 4"
long screw from the HK-128 kit into the mount puck and thread into the cross dowel. Using the view
above, make sure the threaded holes of the mount puck are aligned vertically with the holes in the cross
rail and fully tighten the screw.
2. Next, locate the (2) holes bored on the bottom of the cross rail on the intermediate leg. Insert the 8"
threaded stud from the HK-131 kit into the hole, followed by a mount puck and hex nut as shown above.
When fastening the hex nuts, thread one side until the nut is flush, or just slightly past the end of the stud.
This should allow enough exposed threads to fully tighten the opposite side. Also, when tightening the hex
nuts, make sure the threaded holes of the mount puck are aligned vertically with the holes in the cross rail.
THREADED STUD
CROSS RAIL
MOUNT PUCK
CROSS RAIL
CROSS DOWEL
MOUNT
PUCK
REFER TO INSTRUCTION
SHEETS 1609138 & 1609139
FOR END LEG ASSEMBLY
REFER TO INSTRUCTION SHEET 1609140
FOR INTERMEDIATE LEG ASSEMBLY
3. Using the instruction sheets 1609138,1609139 & 1609140 as an aid, begin assembling the frame together.
Align and insert the wood frame rails onto the legs, making sure the foot rails are being inserted onto
the mount pucks at the same time, as shown in the view above. After the frame has been assembled and
the frame rails fully tightened, secure the foot rails by fastening the flat head screws from the HK-128 &
HK-131 kit through the mounting holes of the foot rails and into the mount pucks.