DigiMatic User Guide
WWW.ODIXION.COM
16/29
3
3
.
.
1
1
.
.
5
5
U
U
s
s
e
e
r
r
b
b
a
a
c
c
k
k
-
-
u
u
p
p
You can save jobs (projects) description on your local HDD. Then the jobs can be started manually, or
automatically using the integrated scheduler.
A job is composed of :
-
CD/DVD content
(list of directories and files to burn)
-
CD/DVD label
(picture and text to print, including printing parameters)
-
CD/DVD parameters
(volume name, format, number of copy, etc…)
The [Back-up] folder is composed of three sub folders:
[Save]: this folder let you save a job on your HDD.
[Load]: this folder let you load a saved job from your HDD.
[Schedule]: this folder let you load and schedule a job saved on your HDD.
After having scheduled a
job, CDWriter will
automatically start the job
when the job date arrives.
Caution
: CDWriter must be
open for the scheduled jobs
to run.
3
3
.
.
1
1
.
.
6
6
S
S
t
t
a
a
t
t
u
u
s
s
The [Status] folder allow
you to follow the status of
all jobs sent to the
DigiMatic as well as
different information such
as ink cartridge level, stack
in and out level, hard disk
drive space, type of media
selected on the machine…