Filling the system
Filling the heating system:
Figure 38:
Filling the heating system
-
Fill the heating system via the drain valve.
-
Vent the pipework.
NOTE
For easier filling, the 3-way switching
valve (multifunctional assembly) is set
to a position suitable for filling at the
factory. The cable from the switching
valve to the OTE controller has been
disconnected at the factory.
➔
Once the system is successfully
filled, connect the plugs
PIN3/N/PE
and
PIN4/N/PE
on the OTE
controller.
Filling the DHW tank:
-
Fill the DHW tank via the cold water
connection.
-
Open all downstream draw-off valves until the
appliance is filled and the pipework is free
from air.
-
Adjust the flow rate. Observe the maximum
permissible flow rate with fully opened valve
(see Specification). If necessary, reduce the
flow rate at the throttle on the safety
assembly.
-
Carry out a leakage test.
-
Test the safety valve.
Summary of Contents for Air Eagle 414
Page 2: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 2 of 76...
Page 63: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 63 of 76...
Page 64: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 64 of 76...
Page 65: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 65 of 76...
Page 66: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 66 of 76...
Page 68: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 68 of 76...
Page 69: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 69 of 76...
Page 70: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 70 of 76...
Page 71: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 71 of 76...
Page 73: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 73 of 76 16 Declaration of conformity...
Page 74: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 74 of 76...
Page 75: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 75 of 76...