EYES
HD GEN2
2020 INSTALL & OPERATION MANUAL
13
6
Appendix
Perform this bonding check after installation of the light and before moving the vessel back into the water.
Refer to bonding information in the installation sections in this manual. If in doubt, please contact OceanLED.
1. Connect the camera assembly to the cathodic protection system as explained in Chapter 3.
2. Measure the electrical continuity between the front bezel and the sacrificial anode. This test should give a
reading of up to 0.5
Ω
(Ohms). This procedure will guarantee electrical continuity between the front bezel, the
mounting tube and sacrificial anode.
If you have any questions regarding the above, please contact OceanLED:
+44 (0) 1455 637505 or [email protected]