![OBO Bettermann EUK System Instructions Download Page 62](http://html1.mh-extra.com/html/obo-bettermann/euk/euk_system-instructions_3161374062.webp)
62 | EN
OBO Bettermann
Completing mounting
device socket
Fig. 26:
Decoupling the underfloor junction box/underfloor device socket
Note!
When laying the underfloor sockets in floating screed, heated
screeds or screeds on separating layers, the underfloor sockets
must be decoupled. This improves noise protection and gives
space to possible deformations of the screed.
1. Release the locking (set mark to "0").
2. Turn in or hold the screws, insert the quick release aid
8
and
pull out the screws.
3. Insert the 4 locks and lock them.
Optional: Decoupling after the floor covering work
Note!
The decoupling of the underfloor junction boxes/underfloor device
sockets can optionally take place after the laying of the floor cover-
ing.
Summary of Contents for EUK
Page 4: ......